Up To 1,159,235 SF
40' Clear
52’ x 50’
(52’ x 60’ in speed bays)
220 W spaces
169 E future spaces
389 Total
257 spaces
182 future spaces
439 Total
Reinforced Tilt-Up Concrete Wall Panels with Textured Painted Finish
12x12 Columns
Steel Bar Joists
White Roof Deck
8” Unreinforced (4,000 PSI)
10,000 SF of 15 Mil Vapor Barrier Under the Slab at Each Building Corner
120 Built
121 Future
241 Total
4
45 Mil White TPO with R-25 Insulation
Make-Up Air Units to Maintain 55 Degrees Minimum
ESFR
3000 Amps 480/227V
LED 30 FC with Motion Sensors
Build to Suit
Jason L. Hetherington, SIOR
Senior Vice President
T +1 804 401 4002
C +1 804 301 0599
jason.hetherington@cbre.com
Christopher E. Todd
First Vice President
P +1 757 448 2132
C +1 757 752 1095
chris.todd@cbre.com
BRAN LOWRY
Associate
P +1 804 401 4007
C +1 804 337 1128
brad.lowry@cbre.com
©2022 CBRE, Inc. All rights reserved. This information has been obtained from sources believed reliable, but has not been verified for accuracy or completeness. You should conduct a careful, independent investigation of the property and verify all information. Any reliance on this information is solely at your own risk. CBRE and the CBRE logo are service marks of CBRE, Inc. All other marks displayed on this document are the property of their respective owners, and the use of such logos does not imply any affiliation with or endorsement of CBRE. Photos herein are the property of their respective owners. Use of these images without the express written consent of the owner is prohibited.